"Metro Plaza", 3rd & 4th Floor, E-5 Arera Colony, Bittan Market, Bhopal – 462  016
 

 

 

 

 

                                                                      
ANALYSIS OF THE INFORMATION SUBMITTED ON MIS FORMATS BY MP POWER TRANSMISSION COMPANY LIMITED FOR THE YEAR  2005-06.

TRANSCO-QUARTERLY MIS TRANSCO                                                                                                         
Format Tr-1

The information on quantum of energy handled by the State Transmission System and the overloading of lines for continuously 2 hours
      
 

SR. NO. Description Units Target
 for the 
Qtr 1
Actual
for the
Qtr 1
Target
 for the
Qtr 2
Actual
for the
Qtr 2
Target
 for the Qtr 3
Actual
for the 
Qtr 3
Target
 for the
Qtr 4
Actual
for the 
Qtr 4
Target
 for the YEAR 
Actual
for the YEAR
Actual
for the  last
year
(04-05)
1 Total Energy Received at Interface Points_ MP Periphery (ISGS + Bi-lateral+SSGS+Other imports) MU 7230.72 6588.47 7108.01 7050.21 9477.20 9533.27 7900.48 8130.07 31716.41 31302.02 29776.07
a Energy received from State Generators including 33 KV Direct Injection to Discoms MU 3674.97 3168.40 3292.63 3265.85 4227.83 4252.35 3783.79 3872.63 14979.22 14559.23 15084.64
b 33KV Direct injection of Discom from MP Genco MU 68.79 63.31 67.58 67.04 81.39 81.39 67.85 78.93 285.61 290.67 264.73
c Energy Received from State Generators Excluding 33KV Direct injection to Discoms (a-b) MU 3606.18 3105.09 3225.05 3198.81 3904.43 4170.96 3715.96 3793.70 14451.62 14268.56 14819.91
d Energy Received from other Generators Indira Sagar MU 138.2 160.81 1354.26 1343.24 611.97 653.75 510.16 397.95 2614.59 2555.75 1321.93
e Energy received from other sources Pichhore-Matatila(UPSEB) MU 1.27 1.07 2.95 2.93 9.07 9.69 7.56 4.11 20.85 17.80 29.78
f Energy Received at Interface points between PGCIL  & MPPTCL  MU 3481.07 3308.67 2494.80 2474.51 4369.46 4667.73 3642.51 3913.59 13987.84 14364.50 13339.72
g Energy Received from Wind farm,National Steel & HEG MU 4.00 12.82 25.46 25.26 22.82 24.38 19.02 14.64 71.30 77.10  
h Energy Received from HEG Mandideep & JP Bela MU     5.49 5.45 6.32 6.76 5.27 6.08 17.08 18.29  
i Total Energy Received at Interface Points excluding 33KV Direct injection from MPPGCL(c+d+e+f+g+h) MU     7108.01 7050.21 9477.20 9533.27 7900.48 8130.07 24485.69 24713.55  
2 Total Energy Sent to Discoms (Excluding 33KV Direct injection) MU 6947.65 6365.10 6751.13 6551.39 8439.13 9015.20 7513.78 8051.14 29651.69 29982.83 28362.46
a Energy Sent to Poorve Khestra MU 2171.02 1976.17 2075.01 2013.62 2414.00 2439.13 2033.69 2232.29 8693.72 8661.21 8405.06
b Energy Sent to Paschim Khestra MU 2481.40 2297.16 2467.12 2394.13 3669.90 3709.67 3091.73 2875.81 11710.15 11276.77 9954.43
c Energy Sent to Madhya Khestra MU 2223.44 2026.08 2200.77 2135.66 2827.00 2858.43 2381.62 2567.74 9632.83 9587.91 10002.97
d. Energy Sent to other Lincessee_SEZ Indore MU 2.00 2.38 8.23 7.98 8.00 7.97 6.74 7.87 24.97 26.20 0.00
e Total Energy Sent to Discoms (Excluding 33KV Direct injection from PH only) MU 6877.86 6301.80 6751.13 6551.39 8918.90 9015.20 7513.78 7683.71 30061.67 29552.10 28097.73
3 Energy Export to Rajasthan MU     0.00 -187.32 0.00 0.00 0.00 0.00 0.00 -187.32 1413.61
4 Energy Loss (1i-2e+3) MU 351.86 286.67 356.88 311.49 558.30 518.07 386.70 446.36 1653.74 1562.59  
5 Total Transmission Loss((4x100/1i) % 4.88% 4.35% 5.02 4.42 5.89 5.43 4.89 5.49 15.85 15.38 4.79
6 Line wise Losses               0.00 0.00  
a. Agregate of 400 kv lines % 1.63 1.49 1.63 1.33 1.36 1.44 1.36 1.36 5.98 5.62  
b. Agregate of 220 kv lines % 3.06 2.88 3.06 2.92 3.55 3.57 3.55 3.49 13.22 12.86  
c.  Agregate of 132 kv lines % 1.25 0.97 1.25 1.21 2.17 1.48 2.17 1.68 6.84 5.34  
7 Name of top 10 lines with Max. congesation in terms of MW for continuosly 2 hrs.     % Over Loading (#)   % Over Loading (#)   % Over Loading (#)   % Over Loading (#)   % Over Loading (#)  
a DAMOH-BIJAWAR 132KV     232.00   224.00   232.00   236.00   236.00  
  BANMORE - MALANPUR 132 KV     184.00               184.00  
  NARSINGPUR - GADARWARA 132 KV     180.00       208.00   232.00   232.00  
b BINA-GWALIOR-I 220KV         196.97   196.97   206.00   206.00  
c BINA-GWALIOR-II 220KV         181.82   185.61   181.62   185.61  
d INDORE-SOUTH- ZONE-II 220KV         170.45           170.45  
e INDORE-SOUTH- ZONE-I 220KV         166.67           166.67  
f MAHALGAON-MOTIJHEEL 132KV     176.00   164.00           176.00  
  MAHALGAON - TIGRA 132 KV     176.00               176.00  
  MAHALGAON - BINA 220 KV     174.24               174.24  
g PICHHORE-DATIA 132KV         160.00           160.00  
h DAMOH-GARHAKOTA 132KV         160.00           160.00  
I BINA-PICHHORE 132KV         160.00           160.00  
j PICHHORE-RAJGHAT 132KV     176.00   160.00   188.00   200.00   200.00  
  PACHHORE - BINA 132 KV     176.00       186.00   188.00   188.00  
  INDORE - UJJAIN II (JAITPURA) 220 KV     166.67               166.67  
  SHUJALPUR - ARNIYAKALAN 132 KV             186.00   182.00   186.00  
  BIJAWAR - TIKAMGARH 132 KV             172.00   181.62   181.62  
  ITTARSI - BARWAHA - 220 KV     162.88       181.82   181.62   181.82  
  GARHAKOTA - SAGAR 132 KV             172.00   181.62   181.62  
                           
 (#)- Calculated on the basis of "SIL" given in CERC Tariff Regulation dated 26.03.2004.
      Note - Figures indicate at Sl.No. 2,3,4 & 5 are tentative. These figures may change after finalization of regional energy accounts by WREB

 

Format Tr-2

The information on system availability, frequency profile, demand met and the capacity addition
 
April 05 TO Mar.  06          
SR. NO.   Units Target for the Qtr 1 Actual for the Qtr 1 Target for the Qtr 2 Actual for the Qtr 2 Target for the Qtr 3 Actual for the Qtr 3 Target for the Qtr 4 Actual for the Qtr 4 Cumulative Target for  current Qtr Cumulative Achieved for current Qtr % Variation in cumulative achievement till current Qtr % Variation in cumulative achievement compared to same Qtr last year MPERC target
(Annual)
1 Total System Availability
a 400 KV % 95.00 98.37 95.00 94.35 95.00 99.08 95.00 99.73 95.00 96.36 (+) 1.41%   95.00
b 220 KV % 95.00 98.27 95.00 99.45 95.00 99.31 95.00 98.24 95.00 98.81 (+) 3.86%   95.00
c 132 KV % 95.00 99.17 95.00 99.15 95.00 99.33 95.00 99.22 95.00 99.16 (+) 4.20%   95.00
d Overall % 95.00 98.55 95.00 98.46 95.00 99.25 95.00 98.78 95.00 98.51 (+) 3.56% +0.17 95.00
2 System Availability of five major critical lines (Board to identify the critical lines)
a 400 kv Indira sagar- Indore % 95.00 99.50 95.00 99.93 95.00 99.73 95.00 100.00 95.00 99.71 (+) 4.72% -0.24 95.00
b 220 kv Amarkantak- Jabalpur % 95.00 99.71 95.00 99.88 95.00 99.96 95.00 99.92 95.00 99.80 (+) 4.81% +1.31 95.00
c 220 kv Birsinghpur- Katni % 95.00 100.00 95.00 100.00 95.00 100.00 95.00 100.00 95.00 100.00 (+) 5.00% +1.52 95.00
d 220 kv Bina- Gwalior % 95.00 99.55 95.00 99.85 95.00 99.93 95.00 99.80 95.00 99.70 (+) 4.71% +0.70 95.00
e 132 kv Damoh- Bijawar % 95.00 99.96 95.00 99.92 95.00 99.65 95.00 100.00 95.00 99.94 (+) 4.94% +0.11 95.00
3 Amount spent on ADB capital projects Rs. in lacs 550.00 360.39 550.00 764.61 4000.00 3595.73 786.00 6698.07 1100.00 1125.00 (+) 2.22% -36.94 Not prescribed
4 Amount spent on PFC capital projects Rs. in lacs 900.00 667.19 900.00 737.94 1000.00 1061.95 1252.00 4061.94 1800.00 1405.13 (-) 28.10% +25.57 Not prescribed
5 Amount spent on  capital projects through internal funding Rs. in lacs 350.00 220.57 350.00 277.99 350.00 343.92 273.00 578.17 700.00 498.56 (-) 40.40% +44.11 Not prescribed
6 Amount spent on  capital projects through other funding Rs. in lacs 350.00 292.90 350.00 114.70 0.00 0.00 397.00 282.29 700.00 407.60 (-) 71.74% +228.62 Not prescribed
7 Duration when Frequency is                            
a ABOVE 50.5 Hz % Time 1.00 0.32 3.31 1.00 1.04 0.49 1.04 0.49 N.A. 1.82 N.A. (-) 1.12 Not prescribed
b 50.2 TO 50.5 Hz % Time 2.00 4.54 22.11 20.21 17.23 8.71 17.23 8.71 N.A. 13.37 N.A. (-) 8.00 Not prescribed
c 49.8 TO 50.2 HZ % Time 34.00 26.37 42.01 51.26 38.32 35.06 38.32 35.06 N.A. 34.24 N.A. (-) 18.27 Not prescribed
d 49.5 TO 49.8 Hz % Time 30.00 30.73 19.01 18.17 29.86 29.20 29.86 29.20 N.A. 24.84 N.A. (+) 7.74 Not prescribed
e 49.0 TO 49.5 Hz % Time 30.00 34.11 12.05 8.66 12.43 24.14 12.43 24.14 N.A. 23.02 N.A. (+) 16.65 Not prescribed
f 48.5 TO 49.0 Hz % Time 2.00 3.92 1.51 0.69 1.12 2.41 1.12 2.41 N.A. 2.71 N.A. (+) 2.34 Not prescribed
g BELOW 48.5 Hz % Time 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 N.A. 0.00 N.A. (-) 0.86 Not prescribed
8 Max. Unrestricted Demand MW 5000 5462 4600 5047 6400 6585 6400 6491 5500 5462 -0.7% 1.1% Not prescribed
9 Max. Demand Met MW 4000 4144 4440 4819 4325 5780 3780 5333 4440 4819 8.5% 13.3% Not prescribed
10 State Generation Share During Max. Demand Met (Thermal+Hydel+Css) MW 2800 3237 3285 3270 3800 4009 3250 3174 3285 3270 (-) 0.5% (-) 4.8% Not prescribed
11 Avg. Demand Met During Quarter MW 3000 3184 3321 3277 * 3889 4581 3428 4502* 3201 3273  * (+) 2.3% (+) 0.30% Not prescribed
12 Base Demand During Quarter (Min. Demand Met) MW 2500 2625 - 2182 N.A. 2964 N.A. 2182 - 2182 - (+)2.50% Not prescribed
13 Capacity addition                            
a Line                            
  400 kv line ckt-km NIL NIL NIL NIL (*) - (*) - NIL NIL 0.00%