"Metro Plaza", 3rd & 4th Floor, E-5 Arera Colony, Bittan Market, Bhopal – 462  016
 

 

 

 

 

   Schedule of Hearing (April-2010)

  3/4/2010
S. No. Petition No. Name  Subject Remarks
1 P-70/09 State Load Dispatch Center . Shakti Bhawan, Rampur, Jabalpur In the matter of proposal for Levy & Collection of fee & charges by SLDC  for FY 2010-11.  
  13/4/2010
S. No. Petition No. Name  Subject Remarks
1 P-8/10 M.P. Power Generating Co. Ltd, Shakti Bhawan, Rampur, Jabalpur In the matter of proposal of MP Power Generating Co. Ltd, for relaxation in operating norms in Regulation MPERC (Terms and Conditions for determination of Generation Tariff) Regulation, RG-26 (1) of2009. Postponed to 11.5.2010
2 P-73/09 M/s. Kalani Industries Pvt. Ltd, Tukoganj Main Road, Indore In the matter of application for sale of electricity to third from non-conventional power source at Rabaria hills Dewas. Postponed to 11.5.2010
3 P-14/10 M/s. Arcil Catalyst P. Ltd, P.O. Biralagram Nagada In the matte of permission under sections 86 (w) of the Electricity Act 2003 for sale of energy provided by his 2 No. WEGs at location 54 & 67 in the windfarm at Jamgodrani, Distt. Dewas to the MP Trading Company Postponed to 11.5.2010
4 P-39/09 M/s HEG Limited Mandideep, Dist. Raisen In the matter of parallel running of 2nd captive power plant 33 MW of HEG Ltd., Mandideep with MP Grid System Postponed to 18.5.2010
  16/4/2010
S. No. Petition No. Name  Subject Remarks
1 P-76/09 M/s.  Som Distilleries Pvt. LTd, 23, Zone -II MP Nagar, Bhopal In the matter of application under section 9 of the Vidyut Sudhar Adhiniyam 2000, read with electricity act 2003 and for recall of order dated 7.3.2007 Postponed to 11.5.2010
2 P-15/10 M.P. Power Transmission Co. Ltd, Block No. -6, G, Shakti Bhawan Rampur Jabalpur In the matter of review of order dated 11th January, 2010 under petition No. 26/2006 for determination of transmission tariff for FY 2009-10 to 2011-12 under section 94 (f) of Electricity Act, 2003. Postponed to 11.5.2010
  28/4/2010
S. No. Petition No. Name  Subject Remarks
1 SMP-07/08 MPERC, Bhopal In  the matter of complaint of agriculture regarding billing on flat of the metered agriculture connections. Postponed to 11.5.2010